k-type-3-story-construction-site-office-prefab-house, k-type-3-story-construction-site-office-prefab-house, /packaging-container-house
Inquiry
Inquiry

K-Type 3-Story Construction Site Labor Camp Prefab House | Temporary Site Office

K-Type 3-story prefab house: waterproof, fireproof, easy assembly with simple tools. Reusable components, high turnover. CE, TUV, ISO9001, ISO14001.

Get a Quote
  • Overview

Overview

Technical Specifications

Parameter Value
Product Type K-Type prefabricated house / 3-story construction site labor camp / temporary site office
Structural Design K Type Prefabricated House modular construction, prefab steel framework
Vertical Configuration 3-story maximum; multi-story structural configuration
Layout Customizable accommodation unit and office layouts
Structural Waterproofing Confirmed structural waterproofing design
Fire Resistance Fireproof design
Assembly Method Easy assembly and disassembly using simple tools
Component Reusability Reorganization and reuse across multiple deployment cycles
Operational Longevity Long service life; high turnover times
Certification Frameworks CE, TUV, ISO9001-2000, ISO14001
Design Support Graphic design and 3D model design / total solutions
Technical Support Online technical support available
Cross-Category Integration Cross-categories consolidation capability
Company Experience 10+ years
Export Markets Global

Key Features & Benefits

  • 3-story vertical K-Type modular configuration maximizes accommodation or office capacity on constrained construction site footprints where horizontal expansion is limited by site boundaries, active work zones, or site access corridors.
  • Structural waterproofing design at component and inter-tier connection level prevents water ingress through panel joints, floor-to-wall interfaces, and roof connections across all three stories — a critical performance requirement for multi-story prefab structures in exposed outdoor project environments.
  • Fireproof design integration across the K-Type structural system addresses the fire separation and flame propagation requirements applicable to multi-story temporary accommodation and office structures under construction site safety regulations.
  • Easy assembly and disassembly using simple tools allows the full 3-story structure to be erected and demobilized by on-site crews without specialist equipment or certified installation contractors, reducing labor cost and schedule dependency at each project phase transition.
  • High turnover times and reorganization-and-reuse capability across the prefab steel framework components extend the service life value of the structure across multiple sequential project deployments, supporting procurement models based on asset reuse rather than single-project expenditure.
  • CE, TUV, ISO9001-2000, and ISO14001 certification with online technical support and full graphic and 3D model design solutions provides the quality management documentation, environmental compliance records, and pre-construction planning support required for multi-story temporary structure project authority submissions.

Applications

  • 1.Deployed as multi-story construction site offices at large civil infrastructure projects where the K-Type 3-story configuration provides management, engineering, and administrative workspace within a compact plan footprint without consuming horizontal site area required for active construction operations.
  • 2.Installed as high-density construction site labor camp accommodation blocks where 3-story vertical stacking of modular units maximizes bed count per site footprint and the reusable component system supports relocation at each sequential project phase.
  • 3.Specified for temporary site office complexes at industrial facility construction projects — refinery, power plant, or process facility — where fireproof design and structural waterproofing meet the site safety and environmental protection requirements for multi-story occupied structures in active construction zones.
  • 4.Used as modular temporary accommodation units at remote or constrained project sites where simple-tool assembly eliminates crane dependency, cross-category consolidation allows integration with other product categories in a single procurement package, and 3D model design support enables site layout optimization prior to delivery.
  • 5.Deployed for international temporary building structures accommodation developments where CE, TUV, ISO9001-2000, and ISO14001 certification documentation supports project authority and building permit submissions, and online technical support provides ongoing installation guidance through commissioning.

FAQ

Q1: What engineering validates the K-Type design for a 3-story vertical configuration at construction sites?

The K-Type prefabricated house is confirmed as a 3-story multi-story structural configuration within the modular prefab steel framework system. Specific load tables, inter-story connection shear capacity values, and vertical load transfer calculations are not confirmed in the current brief — buyers should request the structural engineering documentation and certified load calculations from the manufacturer prior to multi-story site deployment approval.


Q2: What waterproofing systems and fireproof design parameters apply across multi-tier connections?

Structural waterproofing and fireproof design are confirmed engineering attributes of the K-Type system, applying across the full multi-story structure including inter-tier connections. Specific waterproofing membrane types, fire resistance ratings (e.g. REI or FRL classifications), and inter-story compartmentation details are not confirmed in the current brief — buyers should request the fire and waterproofing technical data sheets from the manufacturer for project authority submission.


Q3: What are the assembly, disassembly, reuse, and component transport parameters for demobilization?

The K-Type prefab house is designed for easy assembly and disassembly using simple tools, with components confirmed for reorganization and reuse across multiple deployment cycles. Specific disassembly sequence, component packing dimensions, transport vehicle requirements, and maximum reuse cycle limits are not confirmed in the current brief — buyers should request the demobilization and reuse procedure documentation from the manufacturer for logistics and asset management planning.


Q4: What quality validation, technical support, and design solution access applies to procurement?

The K-Type 3-story prefab house is certified under CE, TUV, ISO9001-2000, and ISO14001, with online technical support and full graphic and 3D model design / total solutions services available from the manufacturer. Buyers should request current certificate documents, scope of online support coverage, and design solution deliverable specifications to confirm the support framework prior to project commitment.

RELATED PRODUCT